Electrical maintenance in an occupied building is set by several rules, not one standard. This guide lists the routine tests an owner or facilities manager has to schedule, how often, who does each one, which rule sets the interval, and what to keep on record. Standards are referenced by designation; the standard itself holds the detail.

How to read this page

Intervals marked as a regulation or standard requirement are drawn from the SafeWork NSW code of practice for managing electrical risks, the Queensland Electrical Safety Regulation 2013, AS/NZS 3760 and AS/NZS 2293.2 as summarised by the regulators and the industry. Where an interval is common practice or an insurer expectation rather than a requirement, it is marked as recommended practice. Section and clause numbers are quoted only where the source states them.

AS/NZS 3000, the Wiring Rules, tells an electrician how to install and alter a system. It does not tell a building owner how often to test it afterwards. The recurring duties come from the work health and safety regulation of each state, which requires plug-in equipment in higher-risk environments and every RCD to be inspected and tested regularly by a competent person; from AS/NZS 3760, the in-service inspection and testing standard that sets the intervals by environment; from AS/NZS 3012 on construction sites; from AS/NZS 2293.2 for emergency lighting; and from AS/NZS 3019 where a periodic assessment of the whole installation is called for. Queensland writes the RCD and equipment intervals into its Electrical Safety Regulation 2013, and those figures are the benchmark most contractors apply in other states.

Who does what

Two kinds of test run in parallel. The push-button test of an RCD and the visual check of a lead or an appliance are user tasks: any trained staff member can do them and record the result. The operating-time test of an RCD, the earth and insulation tests behind a test tag, the switchboard inspection and the emergency lighting discharge test are competent-person tasks, and in most states a licensed electrician or a trained tester carries them out. The owner or facilities manager remains responsible for the schedule, the records and for taking failed equipment out of service.

Routine tests, by system

RCDs (safety switches)

The intervals above are those of the Queensland Electrical Safety Regulation 2013 for specified electrical equipment at workplaces. In New South Wales, clause 165 of the Work Health and Safety Regulation requires RCDs at a workplace to be tested regularly by a competent person, with the record kept until the device is next tested or disposed of; the code of practice points to AS/NZS 3760 for the indicative intervals, which follow the same pattern.

Plug-in equipment (test and tag)

Switchboards and distribution boards

No Australian standard mandates thermal imaging and no statutory interval applies to it. It is the owner's duty of care under WHS legislation and, increasingly, a condition of the building's insurance policy, which is why it sits on the annual schedule and why the reports are kept.

Emergency and exit lighting (AS/NZS 2293.2)

Emergency lighting is an essential fire safety measure. In New South Wales it sits on the building's fire safety schedule and is certified each year in the annual fire safety statement; the AS/NZS 2293.2 logbook is the evidence behind that statement.

Standby power, solar and EV charging

These follow their own standards and the manufacturer's schedule rather than the rules above: a diesel generator under AS/NZS 3010 runs weekly checks, a monthly no-load run, a quarterly load run and an annual service with a full load bank test; a UPS has monthly checks, a six-monthly inspection and an annual battery capacity test; a solar array under AS/NZS 5033 has a six-monthly visual inspection and an annual electrical inspection; an EV charger under AS/NZS 3000 Appendix P has an annual RCD and electrical safety test. The Standara library carries each of them.

What the owner has to keep

A record of every RCD test other than the daily push-button test, kept at least until the device is next tested or disposed of. A test tag on every tested item showing the tester and the dates tested and next due, backed by a register. The emergency lighting logbook with the result for each fitting at each six-monthly test. The annual switchboard inspection and thermal imaging reports, which insurers ask to see and which most owners keep for five years. Where equipment is hired out, the Queensland regulation requires the test records to be kept for five years.

Turning the schedule into a register

The intervals only hold when every board, RCD group, emergency light circuit and plug-in equipment class in the building is listed with its interval, who does it and where the evidence lives. That is an asset register with a maintenance planner on top of it. Standara's library carries the electrical assets with these tasks and intervals attached, so selecting what the building has produces the 12-month schedule, and the compliance report is the record an auditor or insurer asks for. How to build a facilities asset register covers the site walk; the AS 1851 maintenance schedule covers the fire systems that sit beside the electrical ones on the same statement.