User guide

From creating your account to a complete, exportable 12-month PPM planner mapped to Australian and New Zealand Standards.

Updated 5 September 2026

Standara builds a standards-mapped maintenance plan from your asset register. Each site has its own register, planner, callout log, documents and contractors, and everything you need for a site sits in the sidebar on the left. This guide follows that sidebar from top to bottom.

1. Create your account, or join a team

Go to standara.com.au/standara-subscriber, select Log In, then Sign up. Enter your email and a password and confirm your email to activate the account.

If your organisation already has a Standara account, ask the account owner to invite you. Open the invitation link, set a password and you join the existing account. You do not need a separate subscription.

Optional: turn on multi-factor authentication for added security on sign-in.

2. Create your first site

After logging in you land on your sites list. Select New Site. Standara walks you through four steps and opens the dashboard at the end.

  1. Site details. Site name, street address, a site contact and phone (optional), and notes such as access requirements or an after-hours contact. The name and address appear in the header of the planner and on every exported report.
  2. Select assets. Browse the disciplines (Fire & Life Safety, Mechanical & HVAC, Electrical, Hydraulic & Plumbing, Vertical Transport and more) and add the asset types present in the building. Use the search box if you are not sure which discipline an asset belongs to.
  3. Register. Review the register. Each asset carries its governing AS/NZS reference and its maintenance tasks. Remove anything the building does not have, then select Next, Build the planner.
  4. Planner. The 12-month planner is generated from the register. Select Finish setup, open the dashboard to save the site and open its dashboard.

On the Professional and Enterprise plans, New Site first asks what you are setting up: an operating building, or a construction or fit-out project. The construction path is described in section 12.

Tip  Already have an asset list in a spreadsheet? On the Add assets tab, choose Bulk-add from a paste and paste the names one per line. Standara matches them against the library and shows anything it could not match for you to assign by hand.

3. Find your way around

Once a site is open, the sidebar lists everything for that site: Dashboard, Register, Planner, Callouts, Documents, Contractors, Reports and Site settings. Sites in construction also show Commissioning. Select a section to open it. Where a section has more than one view, the tabs appear across the top of the page.

4. Dashboard

The dashboard is the site's front page. Three tabs: Overview, This month and By discipline.

Edit site opens the site details. Download report generates the compliance report: choose Full Report or Summary Report from the menu beside the button.

5. Register

Two tabs: Register and Add assets.

Register lists every asset with its discipline, governing standard and task count. Search by asset, category or standard. Edit Tasks on an asset opens its task list, where you can change descriptions, frequencies, clause references and trade requirements. The change flows through to the planner.

Add assets is the library: browse by discipline, search by keyword, or Bulk-add from a paste. New assets pick up their standard references, tasks and frequencies automatically.

Tip  If an asset is not in the library, tell us through the contact form and we will add it. In the meantime the closest matching type carries the right discipline and trade.

6. Planner

The planner is a 12-month grid, one row per task, grouped by discipline and asset. Two tabs: Calendar and List.

Working the calendar

Progress updates as you work. The List tab shows the same schedule as a table, which is easier on a phone and for checking a single discipline.

Years and carry-over

Year tabs above the grid run from the site's first year to next year. Each year holds its own completions. A visit left incomplete in a past year is carried over: it stays in the overdue count and in Needs attention until you either mark it complete or write it off. To write one off, open the past year, click the overdue cell and enter a short note explaining why it will not be done. The note is kept with the record, and a written-off cell can be reinstated later.

When the schedule starts

If the site has an Operations commenced date in Site settings, nothing is due before that date and each cycle is anchored to that month. A site handed over from construction gets this date from Practical Completion automatically.

Exports

Download report at the top of the planner produces the PDF: choose Full Report or Summary Report from the menu beside it. The Excel and CSV versions of the schedule are on the Reports page.

7. Callouts

Callouts are the reactive log, available on the Professional and Enterprise plans. Three tabs: Open, Closed and All.

Select Log Callout and record the date, priority (Routine, Urgent or Emergency), discipline, the asset, a description of the fault, the contractor, an estimated cost, the status (Open, In Progress or Closed), the invoice reference and notes. Each callout gets a work order reference. Close it out when the work is done; the cost and invoice stay with the record.

8. Documents

Documents are filed by discipline, with a Site drawings folder pinned at the top for architectural and services drawings. Drag files onto a folder or use Browse files. Discipline folders accept PDF, Word, JPG and PNG; the drawings folder also takes DWG and DXF. Service reports, certificates and photos filed here sit beside the tasks they close out, so the annual question is answered from one place.

9. Contractors

Two tabs: Assignments and Directory.

Assignments sets one contractor per discipline. The assignment appears on the planner, the scope of works and the compliance report.

Directory holds your contractors: company, contact, phone, email, website, discipline and service area, ABN and licence number, plus their public liability, professional indemnity and workers compensation cover with the certificate on file and its expiry date. Add your own or pick from the panel list. A contractor in the directory can be assigned to any of your sites.

10. Reports

11. Site settings

Site name, address, contact, phone, notes and the Operations commenced date. Select Save site details when you are done. Leaving the page through the sidebar also saves.

12. Construction projects and handover

On the Professional and Enterprise plans a site can start as a construction or fit-out project. It opens in the Commissioning section instead of the dashboard, with six tabs: Records, Register, Compliance, Handover, Defects and DLP.

13. Team

On the Professional and Enterprise plans, select Team on the sites list to invite colleagues and set their role: owner, member or viewer. Viewers can read every site and report but cannot change anything.

14. Saving, sync and security

15. Need help?

Email info@standara.com.au and we reply within one business day.

Related

You now have a site with a standards-mapped register, a planner you work month by month, and reports you can hand to an auditor, insurer or committee.